Montenegro seeks Pelton runner for 307-MW Perucica

Montenegro utility Elektroprivreda Crne Gore AD-Niksic (EPCG) seeks bids to supply a Pelton turbine runner for the 307-MW Perucica hydroelectric project on Montenegro’s Gornja Zeta River. Bids are due July 9, 2009.

The utility has received financing from the World Bank and the European Investment Bank for rehabilitation of Perucica. It took bids in January for a spare Pelton runner (HydroWorld 1/15/09) and in December for a trashrack and trashrack cleaning machine for the project. (HydroWorld 10/27/08)

A complete set of bid documents may be obtained for the current solicitation from the address below for 300 euros (US$408). The document fee must be paid by direct deposit to the accounts below stating “Payment for IFB APL/5/09.”

Montenegro companies are to use the account of Elektroprivreda Crne Gore AD-Niksic, FC Proizvodnja, No. 535-5658-80 at the Priva Banka CG, with a note, “Za tendrsku dokumentaciju po Pozivu IFB APL/5/09.”

Payments from abroad should be made to the account of Electric Power Co. of Montenegro JSC Niksic, with a note “For the IFB APL/5/09.” Account with institution: PRVA BANKA CRNE GORE PODGORICA, SWIFT CODE: PRVA MEPG. Beneficiary customer: ME 25535005030000000070, ELEKTROPRIVREDA A.D., VUKA KARADZICA 2 NIKSIC. Intermediary bank: DEUTSCHE BANK AG, FRANKFURT, SWIFT CODE: DEUTDEFF, or COMMERZBANK AG, FRANKFURT AM MAIN DE, SWIFT CODE: CPBADEFF, or LHB INTERNATIONALE, HANDELSBANK AG F/M, SWIFT CODE: LHBIDEFF.

Bids are due by 11 a.m. July 9. For information, contact Nadia Bojanic, Procurement Specialist, Elektroprivreda Crne Gore AD-Niksic, FC Proizvodnja, Bulevar Svetog Petra Cetinjskog br. 18, Third Floor, Office No. 304, 81000, Podgorica, Montenegro; (382) 20-201725; Fax: (382) 20-201726; E-mail: epcg.apl@cg.yu; Internet: www.epcg.cg.yu.

Previous articleSierra Leone extends bidding for operator for 50-MW Bumbuna
Next articleUPDATE – U.S. seeks generator repair at 558-MW Bonneville Second

No posts to display