Austria utility seeks refurbishment of 19.2-MW Pernegg

Verbund Austrian Hydro Power AG seeks bids for equipment refurbishment at the 19.2-MW Pernegg hydroelectric project on Austria’s Mur River. Bids are due April 28.

The hydropower operator seeks refurbishment of Pernegg including planning, model acceptance testing, manufacturing, assembly, testing, and start-up of three Francis turbines, governors, and three 8-megavolt-ampere three-phase generators.

Bid documents may be obtained from Verbund Management Service GmbH, Ankerstrasse 6, Kontakt Beschaffung, Herr Dipl.-W.-Ing (FH) Bernd Forstner, A-8054 Graz, Austria; (43) 50313-38075; Fax: (43) 50313-138075; E-mail: bernd.forstner@verbund.at. Bids, in German, are due by noon April 28 to the same address.

For information, contact Verbund Austrian Hydro Power AG, Am Hof 6a, Postfach 88, Kontakt Abteilung f. Maschinenbau und Instandhaltung/EMI, Herr Dipl.-Ing. Christian Weichselbraun, A-1010 Vienna, Austria; (43) 50313-50535; Fax: (43) 50313-150535; E-mail: christian.weichselbraun@verbund.at; Internet: www.verbund.at.

Previous articleUPDATE – Portugal extends bid date to equip 240-MW Alqueva 2
Next articleWorld Bank unit eyes funding two Colombia hydros

No posts to display