Gantry cranes sought for 810-MW Lower Granite, 810-MW Lower Monumental

The U.S. Army Corps of Engineers plans to seek bids to supply replacement gantry cranes at the 810-MW Lower Granite and 810-MW Lower Monumental hydroelectric projects on the Snake River in Washington. Bids are due about May 5.

The Corps’ Walla Walla District is taking bids April 6 to rewind main generator Unit 3 at Lower Granite (HydroWorld 2/19/10), which with Lower Monumental are among four large Corps hydro projects on the Lower Snake. (HydroWorld 9/24/09) The Corps seeks bids by April 9 for a replacement gantry crane at another Lower Snake project, 635-MW Ice Harbor. (HydroWorld 3/16/10)

The current solicitation for Lower Granite and 810-MW Lower Monumental includes design, manufacture, and installation of two 130-ton intake gantry cranes, which are to have trolleys with main hoists and at least one outside actuating hoist each.

A pre-solicitation notice may be obtained from the Federal Business Opportunities Internet site, www.fbo.gov, by entering Solicitation No. W912EF10R0021 in the “Keyword/Solicitation #” box.

A solicitation notice is expected to be issued about April 5, with proposals to be due no sooner than 30 calendar days after the solicitation issuance. The listed May 5 due date is an estimate.

For information, contact Jani Long, U.S. Army Corps of Engineers, Walla Walla District, 201 N. Third Ave., Walla Walla, WA 99362-1876; (1) 509-527-7209; E-mail: jani.c.long@usace.army.mil.

For more hydropower tenders, click here.

Previous articleReplacement stoplogs sought by U.S. for Demopolis Lock and Dam
Next articleSlovenia’s first pumped-storage hydropower project begins operation

No posts to display