Poland utility seeks transformer block for 160.2-MW Wloclawek

Polish utility Energa Hydro Sp. z.o.o. seeks bids to supply a replacement transformer block for the 160.2-MW Wloclawek hydroelectric project on Poland’s Wisla River. Bids are due May 16.

Energa Hydro operates Wloclawek, 44 small hydropower plants, and 156-MW Zydowo pumped-storage project.

The utility seeks delivery, installation, and commissioning of a replacement 72-megavolt-ampere transformer Block 3 for a Kaplan turbine-generator at Wloclawek. The work is to be completed in 270 months for an estimated 387,000 euros (US$571,811).

Tender documents may be obtained from the address below. Bidders are required to arrange a site visit at Wloclawek prior to the bidding deadline.

Bids in Polish are due by 9 a.m. May 16. For information, contact Energa Hydro Sp. z.o.o. (formerly Energa Elektrownie Staszyn Sp. z.o.o.), ul. Hoffmana 5, Attn.: Jerzy Kreczkiewicz, 83-010 Straszyn, Poland; (48) 586921822; Fax: (48) 586921872; E-mail: jkreczkiewicz@energa-hydro.pl; Internet: www.energa-hydro.pl.

For more hydropower tenders, click here.

Previous articleConstruction nearly finished at 334-MW Simplicio hydro project in Brazil
Next articleCorps to seek bids for weir, structures at Canton Lake Dam

No posts to display