Slovakia utility seeks construction of Moson 2 small hydro

BRATISLAVA, Slovakia 3/7/12 (PennWell) — Waterpower utility Vodohospodarska Vystavba seeks bids to build the Moson 2 small hydropower project in Slovakia. Bids are due April 2.

Moson 2 is to be built near the 1.22-MW Moson project, part of the 720-MW Gabcikovo hydroelectric complex that Vodohospodarska operates on the Danube River.

Work is to include construction of an intake, powerhouse, and tailrace; landscaping; cabling; and mechanical and electrical equipment. The contract is valued at 6 million euros (US$7.9 million).

Solicitation documents may be obtained from the address below. Questions are to be submitted by noon March 19.

Bids are due by noon April 2. For information, contact Peter Koren, Vodohospodarska Vystavba, statny podnik, 00156752, P.O. Box 45, Karloveska 2, 842 04 Bratislava, Slovakia; (421) 906311147; Fax: (421) 906311017; E-mail: peter.koren@vvb.sk; Internet: www.vvb.sk.

Previous articleNew bill could remove NEPA compliance from some small hydro projects
Next articleArizona tribe seeks environmental study of Miner Flat Dam project

No posts to display