BC Hydro seeks management of work on 492-MW Bridge River system

Canadian utility BC Hydro seeks bids for project management of maintenance and capital projects on the four-plant, 492-MW Bridge River generating system in British Columbia. Bids are due Oct. 10.

BC Hydro said work on the projects, on Bridge River, is to be performed on an “as, if, and when required” basis over an initial term of two years with an option for extensions up to an additional five years. Project personnel are to be site-based at or near Shalaith, B.C.

Tender information may be obtained from British Columbia’s BC Bid Internet site, www.bcbid.gov.bc.ca. Bids are due by 11 a.m., Pacific time, Oct. 10.

For information, contact BC Hydro and Power Authority, Purchasing Dept., Quotations, Bid Station (Courier Desk/Main Floor), 333 Dunsmuir St., Vancouver, British Columbia V6B 5R3 Canada; (1) 604-623-4346; E-mail: bidstation@bchydro.com; Internet: www.bchydro.com; www.bcbid.gov.bc.ca.