Canada utility seeks spare generator stator for 133-MW Great Falls hydro project

Canadian utility Manitoba Hydro seeks bids to design, supply and assemble a spare generator stator for the 133-MW Great Falls hydroelectric project in Manitoba. A site visit is scheduled Oct. 14, with bids due Nov. 18.

Manitoba Hydro took bids last year to refurbish turbine wicket gates at Great Falls on the Winnipeg River. (HydroWorld 9/4/14) Units at Great Falls are taken down every three years for maintenance. Manitoba Hydro also took bids last year to perform civil construction related to refurbishment of the Unit 4 turbine-generator.

The utility now seeks bids for design, supply and assembly of at least one complete stator for future use at Great Falls.

The solicitation may be obtained from the Canadian Public Tenders Internet site here.

A mandatory site visit is scheduled for 9 a.m., Central time, Oct. 14. To attend, contact Jordan Austman, Manitoba Hydro, (1) 204-360-4821; Fax: (1) 204-360-6143; E-mail: jaustman@hydro.mb.ca.

Bids are due by 4 p.m., Central time, Nov. 18. For information, contact: Manitoba Hydro, Purchasing Dept., P.O. Box 1287 STN MAIN, Winnipeg, MB R3C 2Z1 Canada; Fax: (1) 204-360-6130; E-mail: purchasing@hydro.mb.ca; Internet: www.hydro.mb.ca.
 

Previous articleHydroelectric power, other renewables emphasized at G20 summit
Next articleWeather watching

No posts to display