French energy firm seeks bids to build 2.46-MW Fontenil

French local energy company Energie Developpement Services du Brianconnais (EDSB) seeks bids to construct the 2.46-MW Fontenil hydroelectric project on Durance River at Briancon. Bids are due October 8.

EDSB seeks bids for any or all of four lots:

  • Lot 1 – Design, construction, and installation of electro-mechanical equipment including turbines and generators;
  • Lot 2 – Civil engineering work of desander, supply line, and intake structure;
  • Lot 3 – Construction of powerhouse;
  • Lot 4 – Penstock and tailrace.

Tender documents may be obtained from the first address below. Bids are due by noon October 8 to the second address below.

For information, contact:

  • Bureau Seret quartier du Barlandier, 05300 Ribiers, France; (33) 492632193; E-mail: seret.ingenierie@libertysurf.fr;
  • Directeur Marc Platon, Energie Developpement Services du Brianconnais, Place du General Blanchard, BP 6, 05105 Briancon Cedex, France.

Previous articleBinga hydropower project’s Unit 1 receives Certificate of Compliance
Next articleMorgan Stanley-led group invests another $150 million in Chinese hydropower company

No posts to display