Indonesia extends call for rehab consultants for 187-MW Jatiluhur

Indonesia’s Directorate General of Water Resources has extended the deadline for expressions of interest from consultants to rehabilitate and improve the safety of 187-MW Jatiluhur Dam. Responses now are due September 20.

The directorate originally called for responses by August 26. The agency recruited consultants in 2009 to provide technical assistance to a dam operational improvement and safety program including Jatiluhur on the Citarum River.

The current solicitation calls for a consultant to perform a range of engineering and related services related to safety of Jatiluhur and performance of its reservoir.

Work is to include: determination of sedimentation, current storage, and life expectancy of the reservoir; organization of a workshop for Jatiluhur in accordance with U.S. Federal Energy Regulatory Commission engineering guidelines; major inspection and safety evaluation; improvement of outlet works capacities to enable emergency discharge of water; examination of the main embankment dam and remedial recommendations; examination of the morning glory spillway tower and recommended improvements; design of an automatic data acquisition system; and inspection and recommended repairs for civil structure and hydro-mechanical and electrical works. Other work includes: preparation of an auxiliary spillway concept design; downstream flood assessment; and development of long-term integrated operating procedures for the cascade dams system in the Citarum River.

Expressions of interest and qualifications are due to the address below by September 20. For information, contact Ministry of Public Works, Directorate General of Water Resources, PIU DOISP: Balai Besar Wilayah Sungai (BBWS) Citarum, Attn.: Procurement Committee for Consultancy Services for Special Study on Jatiluhur Dam Safety Improvement and Rehabilitation, Jl. Inspeksi Cidurian Soekarno – Hatta STA 5600, Bandung, West Java Province, Indonesia; (62) 22-7564073; Fax: (62) 22-7505760; E-mail: bbwscitarum@yahoo.com.

For more hydropower tenders, click here.

Previous articleNHA finds Alaska ripe for new hydro development
Next articleU.S. awards headgate rehab contract for Dry Falls Dam in Washington

No posts to display