Portugal utility seeks flood gates for 54-MW Paradela

Utility Energias de Portugal (EDP) seeks bids to install new floodgates at the 54-MW Paradela hydroelectric project on Portugal’s Cavado River. Bids are due October 1.

EDP Gestao da Producao de Energia SA seeks all civil engineering and equipment supply for the floodgate work, including hydro-mechanical equipment and controls for the 50-year-old rockfill dam in Braga Province.

Bid documents may be obtained from the address below for 500 euros (US$685). Documents will be supplied in digital format.

Bids, in Portuguese, are due by 5 p.m. October 1. For information, contact EDP Gestao da Producao de Energia SA, Rua do Bolhao 36, 3 Andar, Attn: Rui Gaspar, Rui Vranas, P-4000-111 Porto, Portugal; (351) 2-2001580; Fax: (351) 2-20013509; E-mail: rui.vranas@edp.pt; Internet: www.edp.pt.

Previous articleAlaska agency awards $1.6 million to 100-kW Eagle hydrokinetic
Next articleConsultants named for S.E. Europe renewables program